40%lower reporting latency
Context
Operational Power BI and SSRS reporting inside a live mining environment.
Baseline
The previous reporting path took longer to move production information into decision-ready reports.
Intervention
Redesigned the reporting layer and its production data pipelines.
My role
Data-system design, implementation, and operational support.
Verification
Observed against the previous production reporting path. Internal records and absolute timings are confidential.
System path
  1. 01Production sources
  2. 02Pipelines
  3. 03Reporting model
  4. 04Decision-ready reports

Topics: Data engineering · Operational software · Mining technology

Similar constraint?

Let’s look at your operation.

Work with me